Our lecturer for Building
Services is Ms Lim Tze Shwan. She is a nice lecturer and always gave us a warm
and big smile when she saw us.Although Miss Lim is a part timer lecturer,she
also very patient and teach us until we understand.
In this semester, the syllabus focuses on Ventilation, Telecommunication, Storm water system, Drainage, sewerage and treatment, Cold water supply, Hot water supply and so on.In this subject, we have an assignment which we needs to do both the report and presentation.
Group assignment 1:hot water supply systems + Case Study
Through this assignment I learnt how to identify the application system, installation,process, benefits, problems and anything relevant to hot water supply systems. I gained a lot of useful information of it. We need to find a case study and explain it, but finding the case study was tough and after we found it, all 7 if us have some hard time interpreting what it does and what it means.
Reflection:
No comments:
Post a Comment