Professional Practice1

For this assignment, we need to form a group of 5 people. We need to propose the best procurement, tendering and contract arrangement based on the situation given in a report format.We need to decide which procurement, tendering and contract arrangement that we want to propose. After our discussion, our group decides to use Management Contracting procurement method, two stage selective tendering method and PAM 2006 Contract.We divide the task among the group members. After everyone has done their part, we compile it together. We need to submit our assignment and check our report properly to avoid plagiarism.\


Besides that, we also have presentation. Every group only has 10 minutes to present.

Reflection

Through this assignment, I have a better understanding on each procurement, tendering and contract arrangement. I learn how to analyze which method is the most suitable for that particular situation. We should look at the client’s requirement before we make any advice to the client. Different situation should use a different method.The challenging part of this assignment is the contract arrangement. We are using Management Contracting procurement method, but PAM 2006 Contract does not cover it. It does not have Management Contractor inside PAM 2006 Contract. After our discussion, we decide to modify PAM 2006 Contract.Furthermore, I want to say thank you to my entire group member. We are able to carry out a good teamwork and finish the assignment on time. Everyone did their job very well. Lastly, I need to say thank you to our lecturer for helping us and guide us on this assignment.

No comments:

Post a Comment

Project Management

The Project Management module is module introduced in semester 6 which introduces students to the job scope and concept towards the Cons...